国产真人无码作爱视频免费,亚洲欧洲第一的日产a片,亚洲人成无码网WWW电影蜜芽,亚洲Av毛片久久久久

Hotline:400-880-1556

English




Notice! The 3rd and 4th stage product certification implementation plan of India TEC has been revised again

Author:中認聯(lián)科 time:2022-06-29 Ctr:1334

On June 13, 2022, the Engineering Centre of India (TEC) made some changes to the circular issued on January 31, 2022. The contents are as follows

1. Extend the mandatory date of products in Phases 3 and 4 from the original July 1, 2022 to July 1, 2023.

2. The acceptance date of ILAC reports from foreign laboratories has been revised (extended from June 30, 2022 to June 30, 2023).

This bulletin applies to all products mentioned in Circular 5-2/2021-TC/TEC/112 dated January 31, 2022, except for those mentioned in bulletin S.O. 2372(E) dated May 24, 2022 Except for products. In addition, all other conditions and details mentioned in Circular 5-2/2021-TC/TEC/112 dated January 31, 2022 shall remain unchanged.

List of the 3rd batch of TEC compulsory certification products

MTCTE第Ⅲ階段的產(chǎn)品清單.png

The 4th batch of TEC compulsory certification product list (required conditions)

MTCTE第IV階段的產(chǎn)品清單.jpg

Warm Tips

It is recommended that relevant companies always pay attention to the update of relevant regulations on TEC in India, and make timely adjustments when the regulations are updated to avoid unnecessary losses. Our company has rich experience in product testing, which can help you easily understand whether the product is safe and compliant. If you need it, please feel free to contact us, and our engineers will serve you as soon as possible!

Related Articles
  • ZRLK helps outdoor energy storage power supply, UN38.3 certification quickly issued!

  • ZRLK one-to-one service helps outdoor energy storage power supply quickly obtain 3C certification

  • Soft pack battery 3C certification one-stop service, Sino Joint Branch help easy certification!

  • Halter Fan battery KC certification: Guard the summer cool "green pass"

Follow Us